Commercial solar and batteries, engineered properly
We log your load, design to SANSÂ 10142-1, install, and sign off with our own registered electrician. Solar and battery energy storage (BESS) from 50Â kW to over 1Â MW, anywhere in South Africa.
- Sigenergy certified installer
- Herholdt's Premium Partner
- PV GreenCard installer
- Registered electrical contractor
Partners, brands and accreditations
Certified installer
Premium Partner
- ITS-approved installer
Latest project
Industrial solar and BESS
Our latest project pairs 600Â kWp of solar with a 1.25Â MWh battery energy storage system (BESS) on an industrial site.
- 600kWpSolar PV
- 1.25MWhBESS
What we build
Every system is sized from your own load data and designed around your supply, your roof and the way your site runs.
50Â kW to 1.2Â MW
Hybrid solar with battery backup
Batteries (BESS) that carry the whole site, or just the critical loads, through outages, with the switch-over built into the system. Sigenergy and Deye.
Commercial solar50Â kW and up
Grid-tie solar
Daytime generation without batteries, set to zero export and ready for batteries later. Sigenergy, and Sungrow above 1Â MW.
Existing or new generators
Generator integration
We connect your generators so the batteries carry the site first and the generator starts only when they run low.
7 to 22Â kW chargers
EV charging
AC chargers for fleets, staff and visitors, wired, protected and connected to your solar system.
ITS-approved installer
Heat pumps
ITS heat pumps for hostels, kitchens and change rooms: supply, installation and the annual service.
Registered electrical contractor
Electrical and aircon
LED retrofits, dedicated circuits, DB upgrades and CoCs, plus aircon and HVAC: installation, servicing, repairs and regassing.
All services
How a hybrid system powers your site
One inverter manages solar, batteries, the grid and your generator, and decides where every kilowatt goes.
- Solar runs the site first. During the day the panels supply your loads directly.
- Spare solar charges the BESS. The system is set to zero export, so nothing is pushed back into the grid.
- The BESS carries the site. In the evening and through outages. The grid or your generator takes over only when the batteries run low.
How a commercial project runs
One team from the first site visit to the last certificate, with the scope and price agreed before we start.
-
1Assess
We measure before we size
We log your site's load for about a week with a power analyser and go through your bills, so the system is sized on how your site really runs.
-
2Design
Designed to SANSÂ 10142-1
Roof layout, yield model and single-line diagram, with a structural check and Pr Eng sign-off where your municipality needs one. You get options, with the assumptions shown.
-
3Build
Installed to a written standard
We work to our own installation standard under a site safety file, with our registered Installation Electrician supervising, inspecting and testing.
-
4Connect
Certified and registered
Commissioning, Certificate of Compliance and zero-export switch-on, then we see your SSEG application through. Systems over 100Â kW are registered with NERSA too.
-
5Support
Looked after afterwards
We set your system up on the manufacturer's monitoring platform and offer maintenance plans to keep it performing.
The equipment we install
Two hybrid platforms for different budgets, designed and installed to the same standard.
-
Our premium range, and all our grid-tie systems
Commercial solarWe're a Sigenergy certified installer. Sigenergy combines solar, batteries and backup in one modular platform, monitored on the Sigen Cloud.
- Homes: SigenStor and SigenStor Neo, with backup built into Neo
- Business: 50 and 110Â kW hybrids, up to three on one backup supply without a gateway
- Whole-site backup up to 1.2Â MW through a Sigenergy gateway
- Grid-tie systems and EV chargers
-
Our value range, for homes and business
Solar for homesDeye hybrid inverters and batteries are the heart of our home packages, and of commercial systems where the budget matters most.
- Homes: single and three-phase hybrid inverters with Deye batteries
- Business: 50 to 125Â kW hybrids, and 250 and 500Â kW PCS systems for larger sites
- Installed to our own standard, with a fuse on every battery lead and an earth spike at every inverter
Recent work
Plant room with inverters and battery racks
Battery cabinets
Flat-roof array on ballast mounts
Inverter and battery room
Two-inverter installation
Businesses we've worked for
Who we build for
Different sites need different systems. These are the ones we're asked about most.
-
Manufacturing
Daytime production and three-phase motor loads, sized from a week of logged data.
-
Retail and wholesale
Cold rooms, tills and lighting kept running when the grid goes down.
-
Filling stations
Canopy arrays kept clear of hazardous zones, with backup for pumps, tills and the shop.
-
Healthcare
Solar and batteries that work alongside your generators and changeovers without changing how they operate.
-
Warehousing and logistics
Big roofs and daytime loads, suited to grid-tie systems that are ready for batteries later.
-
Schools and student housing
Daytime solar for classrooms and offices, and heat pumps for hostel hot water.
-
Farms and agri-processing
Mills, pumps and cold storage, working with the generators you already have.
Solar for your home
The same engineering, sized for a house. Deye and Sigenergy hybrid systems, designed from your electricity bill.
- Three options in every quote, from daytime savings to about 95% of your energy from solar
- A Certificate of Compliance and an earth spike on every installation
- Start with one battery and add more later
Tell us about your site
Send us the basics and we'll come back with a budget proposal and a date for a site visit.
What to send us
- Your last 12 months of electricity bills
- The size of your supply, in amps or kVA
- The site's address or a map pin
- Photos of the main DB and the roof, if you have them