Solar and battery systems for business and industry

From a 50 kW grid-tie roof to a 1 MW hybrid plant with battery energy storage (BESS) and whole-site backup. We size from your logged load, build to SANS 10142-1 and handle the certificates and registrations.

  • Sigenergy, Deye and Sungrow
  • Load logging on every site
  • SSEG and NERSA handled
  • Herholdt's Premium Partner

Partners, brands and accreditations

  • Sigenergy certified installer Certified installer
  • Herholdt's Premium Partner Premium Partner
  • PV GreenCard installer
  • Deye
  • Registered electrical contractor
  • Samsung
  • Level 1 B-BBEE
  • Alliance
  • ITS-approved installer

Systems we build

We recommend the system that fits your load and your supply, and show you the alternatives next to it.

  • Up to 1.2 MW

    Hybrid with whole-site backup

    Sigenergy hybrids switch your site to battery without a separate changeover, for up to three inverters on one backup supply. Bigger sites run through a Sigenergy gateway up to 1.2 MW.

  • Critical loads only

    Partial backup

    Where whole-site backup isn't needed, we move your essential circuits onto a backup board and size the batteries for those.

  • 50 kW and up

    Grid-tie, battery-ready

    Hybrid inverters run grid-tied with a sensor on your incomer and zero export, so batteries can be added later without new inverters. Sungrow for sites above 1 MW.

  • Batteries first

    Generator integration

    Your generators stay on their own changeovers. The batteries carry the site first, and the generator starts only when they run low.

  • 50 to 500 kW

    Deye commercial systems

    Deye hybrid and PCS systems where the budget calls for them, on the same design and installation standard.

  • After handover

    Monitoring and maintenance

    Systems are set up on the manufacturer's monitoring platform, and we offer maintenance plans to keep them performing.

How a hybrid system powers your site

One inverter manages solar, batteries, the grid and your generator, and decides where every kilowatt goes.

  1. Solar runs the site first. During the day the panels supply your loads directly.
  2. Spare solar charges the BESS. The system is set to zero export, so nothing is pushed back into the grid.
  3. The BESS carries the site. In the evening and through outages. The grid or your generator takes over only when the batteries run low.
Solar PV Your site Hybrid inverter BESS Grid or generator

The equipment we install

Two hybrid platforms for different budgets, designed and installed to the same standard.

  • Sigenergy

    Our premium range, and all our grid-tie systems

    We're a Sigenergy certified installer. Sigenergy combines solar, batteries and backup in one modular platform, monitored on the Sigen Cloud.

    • Homes: SigenStor and SigenStor Neo, with backup built into Neo
    • Business: 50 and 110 kW hybrids, up to three on one backup supply without a gateway
    • Whole-site backup up to 1.2 MW through a Sigenergy gateway
    • Grid-tie systems and EV chargers
    Book a site assessment
  • Deye

    Our value range, for homes and business

    Deye hybrid inverters and batteries are the heart of our home packages, and of commercial systems where the budget matters most.

    • Homes: single and three-phase hybrid inverters with Deye batteries
    • Business: 50 to 125 kW hybrids, and 250 and 500 kW PCS systems for larger sites
    • Installed to our own standard, with a fuse on every battery lead and an earth spike at every inverter
    Solar for homes

How a commercial project runs

One team from the first site visit to the last certificate, with the scope and price agreed before we start.

  1. 1Assess

    We measure before we size

    We log your site's load for about a week with a power analyser and go through your bills, so the system is sized on how your site really runs.

  2. 2Design

    Designed to SANS 10142-1

    Roof layout, yield model and single-line diagram, with a structural check and Pr Eng sign-off where your municipality needs one. You get options, with the assumptions shown.

  3. 3Build

    Installed to a written standard

    We work to our own installation standard under a site safety file, with our registered Installation Electrician supervising, inspecting and testing.

  4. 4Connect

    Certified and registered

    Commissioning, Certificate of Compliance and zero-export switch-on, then we see your SSEG application through. Systems over 100 kW are registered with NERSA too.

  5. 5Support

    Looked after afterwards

    We set your system up on the manufacturer's monitoring platform and offer maintenance plans to keep it performing.

What's included

  • About a week of load logging, and a review of your bills
  • Roof layout, yield model and options, with the assumptions shown
  • A structural check, and Pr Eng sign-off where your municipality needs it
  • Design and single-line diagram to SANS 10142-1
  • A site safety file for the installation
  • Installation, commissioning and a Certificate of Compliance
  • The SSEG application, and NERSA registration for systems over 100 kW
  • Monitoring on the manufacturer's platform, and a maintenance plan if you want one
  • On leased premises, a letter to your landlord about the roof mounting and the options at the end of your lease

Every commercial quote starts from a standard, fully costed system, so you can compare the options line by line and see exactly what changes between them. Prices are shown excluding and including VAT.

The signed agreement and the estimate you accept form the contract. We take a 70% deposit and the balance on completion, and site work can start from two weeks after the deposit.

Questions from business owners

Will solar cut our demand (kVA) charges?

Sometimes, but we don't promise it. Demand charges are set by your highest peak in the month, and one cloudy afternoon can set that peak. We model your energy saving, and treat any demand saving as a bonus.

Do we need to register with NERSA?

Systems over 100 kW that connect to the grid must be registered with NERSA, even when they export nothing. Every system also needs approval from your municipality or Eskom. We handle both on commercial projects.

Can we install solar if we lease the building?

Yes. We write to your landlord about the roof mounting and what happens at the end of your lease, and we design the system so it can be removed.

Will it work with our generators?

Yes. We normally leave your generators on their own changeovers. The batteries carry the site first, and the system signals the generator to start when the batteries run low.

How long does installation take?

As a guide, a 50 kW system takes two to three weeks on site. Larger plants are planned with you during design, including any shutdown your site needs for the connection.

Is there a tax benefit?

Solar PV can qualify for accelerated capital allowances under section 12B of the Income Tax Act. Ask your accountant how it applies to your business.

Tell us about your site

Send us the basics and we'll come back with a budget proposal and a date for a site visit.

What to send us

  1. Your last 12 months of electricity bills
  2. The size of your supply, in amps or kVA
  3. The site's address or a map pin
  4. Photos of the main DB and the roof, if you have them